Data below generated for:

“Model Year DA_pt5 Solution-rplexos.db, Model Year DA_noCSP_pt5 Solution-rplexos.db”


Annual Dispatch Stacks


1. Total Generation


1.1. Generation Differences


2. Zonal Generation


2.1. Zonal Generation Differences


3. Regional Generation


3.1. Regional Generation Differences


4. Individual Regions

1

2

3


5-7. Specified Period Dispatch Stacks

5. Total

Spring Week

Summer Day


6. Zones

Spring Week : 1

Summer Day : 1

Spring Week : 2

Summer Day : 2

Spring Week : 3

Summer Day : 3


7. Regions

Spring Week : 1

Summer Day : 1

Spring Week : 2

Summer Day : 2

Spring Week : 3

Summer Day : 3


8-11. Curtailment


8. Average Daily Curtailment

8.1. Average Daily Curtailment Differences


9. Average Daily Curtailment by Type

9.1. Average Daily Curtailment Differences by Type


10. Average Interval Curtailment

10.1. Average Interval Curtailment Differences


11. Average Interval Curtailment by Type

11.1. Average Interval Curtailment Differences by Type


12. Total Gen

Type Base No CSP
PV 1,157.75 1,157.99
CSP 922.65 NA
RTPV 1,515.64 1,514.98
Wind 2,556.53 2,557.53
SynchCond 0.00 0.00
Oil/CT 0.86 1.07
Oil/Steam 0.29 0.51
NG/CT 810.43 997.34
NG/CC 4,565.92 5,086.15
Hydro 4,073.47 4,073.47
Coal/Steam 18,456.06 18,667.75
Nuclear 3,500.89 3,503.71

Percent of Total Generation

Type Base No CSP
PV 3.08 3.08
CSP 2.46 NA
RTPV 4.04 4.03
Wind 6.81 6.81
SynchCond 0.00 0.00
Oil/CT 0.00 0.00
Oil/Steam 0.00 0.00
NG/CT 2.16 2.66
NG/CC 12.16 13.54
Hydro 10.85 10.85
Coal/Steam 49.14 49.70
Nuclear 9.32 9.33

12.1 Total Gen Difference

GWh Generation Difference

Type Base No CSP
PV 0 0.23
CSP 0 -922.65
RTPV 0 -0.66
Wind 0 1.00
SynchCond 0 0.00
Oil/CT 0 0.21
Oil/Steam 0 0.22
NG/CT 0 186.91
NG/CC 0 520.24
Hydro 0 0.00
Coal/Steam 0 211.68
Nuclear 0 2.83

13. Total Curtailment (GWh)

scenario Type Available Energy Generation Curtailment Percent Curtailed, %
Base PV 1,159.23 1,157.75 1.47 0.13
No CSP PV 1,159.23 1,157.99 1.24 0.11
Base RTPV 1,516.60 1,515.64 0.96 0.06
No CSP RTPV 1,516.60 1,514.98 1.62 0.11
Base Wind 2,568.36 2,556.53 11.83 0.46
No CSP Wind 2,568.36 2,557.53 10.83 0.42
Base Total 5,244.19 5,229.92 14.26 0.27
No CSP Total 5,244.19 5,230.49 13.69 0.26

13.1. Total Curtailment Difference

scenario Type Available Energy Generation Curtailment
Base PV 0 0.00 0.00
No CSP PV 0 0.23 -0.23
Base RTPV 0 0.00 0.00
No CSP RTPV 0 -0.66 0.66
Base Wind 0 0.00 0.00
No CSP Wind 0 1.00 -1.00
Base Total 0 0.00 0.00
No CSP Total 0 0.57 -0.57

14. Total Costs (MM$)

Type Base No CSP
Emissions 0.000000 0.000000
Fuel 654.270525 694.623123
Start & Shutdown 2.119425 1.838461
VO&M 0.000000 0.000000
Total 656.389950 696.461584

14.1. Total Cost Differences

Type Base No CSP
Emissions 0 0.000000
Fuel 0 40.352598
Start & Shutdown 0 -0.280964
VO&M 0 0.000000
Total 0 40.071634

15. Region and Zone Info (GWh)

Region Name scenario Exports Imports Load Unserved Energy
1 Base 5,466.46 706.39 12,140.02 0
1 No CSP 5,638.91 557.71 12,140.02 0
2 Base 2,630.29 1,710.15 12,158.34 0
2 No CSP 2,222.52 2,005.44 12,158.34 0
3 Base 321.99 6,002.19 13,262.13 0
3 No CSP 350.48 5,648.76 13,262.13 0
Zone Name scenario Exports Imports Load Unserved Energy
1 Base 5,466.46 706.39 12,140.02 0
1 No CSP 5,638.91 557.71 12,140.02 0
2 Base 2,630.29 1,710.15 12,158.34 0
2 No CSP 2,222.52 2,005.44 12,158.34 0
3 Base 321.99 6,002.19 13,262.13 0
3 No CSP 350.48 5,648.76 13,262.13 0

15.1. Region and Zone Differences (GWh)

Zone Name scenario Exports Imports Load Unserved Energy
1 No CSP 172.45 -148.68 0 0
2 No CSP -407.77 295.29 0 0
3 No CSP 28.49 -353.44 0 0

16. Total Interface Flow (GWh)

[1] "No interfaces specified. No interface data will be shown."


17. Average Interval Interface Flow

[1] "No interfaces specified. No interface data will be shown."

Average Daily Interface Flow

[1] "No interfaces specified. No interface data will be shown."

17.1. Difference in Average Interval Interface Flow

[1] "No interfaces specified. No interface data will be shown."

Difference in Average Daily Interface Flow

[1] "No interfaces specified. No interface data will be shown."

18. Specified Period Interface Flow Plot

No interfaces specified. No interface data will be shown.


19. Line Flow Table

name scenario GWh
113_316_1 Base 598.847
113_316_1 No CSP 620.937


20. Average Interval Line Flow


Average Daily Line Flow


20.1. Difference in Average Interval Line Flow


Difference in Average Daily Line Flow


21. Specified Period Line Flow Plot

Spring Week

Summer Day


22-25. Reserves


22. Total Reserve Provision (GW)

Type Base No CSP
Flex Down 284.9540 284.954
Flex Up 308.2970 308.297
Reg Down 455.2000 455.200
Reg Up 450.9812 450.978
Spin Up 1,126.8147 1,126.815

22.1 Total Reserve Provision Difference (GW)

Type Base No CSP
Flex Down 0 0.000000
Flex Up 0 0.000000
Reg Down 0 0.000000
Reg Up 0 -0.003246
Spin Up 0 0.000000

23. Total Reserve Shortage (GW)

Type Base No CSP
Flex Down 0.00000 0.000000
Flex Up 0.00000 0.000000
Reg Down 0.00000 0.000000
Reg Up 0.01277 0.016016
Spin Up 0.00000 0.000000

23.1 Total Reserve Shortage Difference (GW)

Type Base No CSP
Flex Down 0 0.000000
Flex Up 0 0.000000
Reg Down 0 0.000000
Reg Up 0 0.003246
Spin Up 0 0.000000


24. Average Interval Reserve Provisions

Average Daily Reserve Provisions


24.1. Difference in Average Interval Reserve Provisions

Difference in Average Daily Reserve Provisions


25. Reserve Provisions by generator type


25.1. Difference in Reserve Provisions by generator type


26. Region and Zone Generation (GWh)

Region scenario Curtailment PV CSP RTPV Wind SynchCond Oil/CT Oil/Steam NG/CT NG/CC Hydro Coal/Steam Nuclear Load
1 Base 10.54 292.35 0.00 138.97 2,192.48 0 0.26 0.13 199.24 727.95 1,160.43 8,687.40 3,500.89 12,140.02
1 No CSP 9.78 292.12 0.00 138.92 2,193.51 0 0.37 0.30 231.08 872.99 1,160.43 8,827.78 3,503.71 12,140.02
2 Base 0.68 299.36 922.65 24.21 0.00 0 0.24 0.00 237.99 1,209.55 1,937.88 8,446.60 0.00 12,158.34
2 No CSP 0.56 299.48 0.00 24.21 0.00 0 0.26 0.00 309.83 1,292.97 1,937.88 8,510.80 0.00 12,158.34
3 Base 3.04 566.04 0.00 1,352.46 364.05 0 0.36 0.16 373.20 2,628.41 975.16 1,322.07 0.00 13,262.13
3 No CSP 3.35 566.38 0.00 1,351.85 364.02 0 0.45 0.21 456.43 2,920.20 975.16 1,329.16 0.00 13,262.13
Zone scenario Curtailment PV CSP RTPV Wind SynchCond Oil/CT Oil/Steam NG/CT NG/CC Hydro Coal/Steam Nuclear Load
1 Base 10.54 292.35 0.00 138.97 2,192.48 0 0.26 0.13 199.24 727.95 1,160.43 8,687.40 3,500.89 12,140.02
1 No CSP 9.78 292.12 0.00 138.92 2,193.51 0 0.37 0.30 231.08 872.99 1,160.43 8,827.78 3,503.71 12,140.02
2 Base 0.68 299.36 922.65 24.21 0.00 0 0.24 0.00 237.99 1,209.55 1,937.88 8,446.60 0.00 12,158.34
2 No CSP 0.56 299.48 0.00 24.21 0.00 0 0.26 0.00 309.83 1,292.97 1,937.88 8,510.80 0.00 12,158.34
3 Base 3.04 566.04 0.00 1,352.46 364.05 0 0.36 0.16 373.20 2,628.41 975.16 1,322.07 0.00 13,262.13
3 No CSP 3.35 566.38 0.00 1,351.85 364.02 0 0.45 0.21 456.43 2,920.20 975.16 1,329.16 0.00 13,262.13

27. Capacity Factors

Type scenario MaxCap (GWh) Gen (GWh) Capacity Factor (%)
Oil/CT Base 240.0 0.86 0.04
Oil/CT No CSP 240.0 1.07 0.05
Coal/Steam Base 2,317.0 18,456.06 90.68
Coal/Steam No CSP 2,317.0 18,667.75 91.72
PV Base 484.0 1,157.75 27.23
PV No CSP 484.0 1,157.99 27.24
NG/CC Base 3,550.0 4,565.92 14.64
NG/CC No CSP 3,550.0 5,086.15 16.31
NG/CT Base 1,485.0 810.43 6.21
NG/CT No CSP 1,485.0 997.34 7.65
SynchCond Base 0.0 0.00 NaN
SynchCond No CSP 0.0 0.00 NaN
Oil/Steam Base 84.0 0.29 0.04
Oil/Steam No CSP 84.0 0.51 0.07
RTPV Base 827.6 1,515.64 20.85
RTPV No CSP 827.6 1,514.98 20.84
Nuclear Base 400.0 3,500.89 99.64
Nuclear No CSP 400.0 3,503.71 99.72
Hydro Base 1,000.0 4,073.47 46.37
Hydro No CSP 1,000.0 4,073.47 46.37
Wind Base 861.8 2,556.53 33.77
Wind No CSP 861.8 2,557.53 33.78
CSP Base 200.0 922.65 52.52

28. Region Price Duration Curves


29. Reserve Price Duration Curves


30-31. DA-RT Committment and Dispatch Plots

30. Zones

Section not run according to input file.

31. Regions

Section not run according to input file.


32. Revenue by Generator Type


33-34. Generation comparison by Generator Type

33. Zones

NG/CC : 1

NG/CT : 1

Hydro : 1

Hydro : 2

NG/CT : 2

NG/CC : 2

NG/CT : 3

NG/CC : 3

Hydro : 3

34. Regions

NG/CC : 1

NG/CT : 1

Hydro : 1

Hydro : 2

NG/CT : 2

NG/CC : 2

NG/CT : 3

NG/CC : 3

Hydro : 3


35. Model Run Times

phase Base No CSP
MT Schedule NA NA
PASA NA NA
Primary Compilation 00:00:07.5 00:00:01.5
ST Schedule 14:17:54.4 NA
Secondary Compilation 00:00:00.6 00:00:00.7

36. Installed Capacity